PROJECTS / TSEUNG KWAN O TWO-BEDROOM

Tseung Kwan O two-bedroom whole-home custom furniture

Light wood tones, warm lighting and full-height storage run through this project, solving the narrow living-dining space, small bedrooms and high storage needs common in HK two-bedroom flats — with a living-room storage wall, master tatami bed with wardrobe and desk, and a kids' bunk bed room.

Living-Dining: unified storage wall and sideboard

The living-dining area uses full-height light-wood cabinets that integrate the TV cabinet, display niches, sideboard storage and hidden storage into one visual system. Warm LED strips reduce the heaviness of large cabinet surfaces — ideal for narrow HK living rooms.

Master Bedroom: tatami bed + wardrobe + desk

The master bedroom combines a tatami bed, under-bed drawers, a full-height wardrobe and a window-side desk, keeping sleep, storage and work in a compact HK room. Under-bed and wall cabinets store bedding, clothes and sundries.

Second Bedroom: bunk bed + desk

A bunk bed frees up floor space, while the right side is fitted with a desk, wall cabinets and a wardrobe — covering sleeping, studying and storage for a kids' or family room.

DESIGN FOCUS

Design focus

Many two-bedroom flats in Tseung Kwan O, the New Territories and Kowloon face narrow living rooms, small bedrooms and limited storage. FameHouse first studies your family, daily flow and what you need to store, then integrates HK furniture, wardrobes, tatami beds, bunk beds, desks and a living-room storage wall into one complete solution.

Book a Measuring for a Similar Plan
MORE PROJECTS

More projects