A sea-view window-side tatami bed, full-height wardrobe, desk and under-bed drawers integrate sleep, study, clothes and bedding storage for a Hong Kong family bedroom.
The tatami bed fits the window and wall dimensions precisely, with under-bed drawers storing bedding and off-season items; the full-height wardrobe and desk on the left connect as one piece, reducing loose furniture in the small room.
The bed, wardrobe, desk and open niches share the same light-wood and cream doors, with under-bed drawers and warm LED strips balancing storage and atmosphere — built for long-term family use in Hong Kong.