White minimalist doors, sintered stone, light wood and warm LED strips form one visual language, extending from the open kitchen to the master and second bedrooms — so a compact HK unit keeps cooking, storage, rest and work functions.
Under-bed drawers, a long desk and a full wall of wardrobes boost storage, with white doors paired with dark wood desks and shelf LED strips — continuing the Italian minimalist feel of the open kitchen for a HK master bedroom that needs a workspace.
The second bedroom uses a different layout, combining a single bed, window-side study desk, open shelves and a low cabinet to keep walking space while serving as a kids', guest or study room.
When Hong Kong families plan a kitchen, they usually also need living-room storage, bedroom wardrobes, desks and tatami beds at the same time. FameHouse coordinates the kitchen and whole-home customisation with one material, colour and craft standard, so each space works as one whole instead of room by room.
Book a Measuring for a Similar Plan