OUR PROCESS

From measuring to move-in, delivered by two coordinated teams

Consultation, measuring, design, production and installation are fully transparent and controlled: a Hong Kong team by your side, precise production at our own smart factory in Zhejiang.

Consultation

We learn your floor plan, family, budget, storage pain points and style preferences, and confirm the solution scope (entrance, living, kitchen, bedroom, bathroom).

On-Site Measuring

Our Hong Kong team visits your home to record walls, beams, utility points, window sills and installation constraints, ensuring the design can be built.

Proposal & Quote

We provide floor planning, visual references, material advice and a clear itemised quote; once confirmed, we develop detailed production drawings.

Production & Install

Production at our Zhejiang factory, cross-border logistics, on-site installation and handover in Hong Kong, with aftercare follow-up.

WHY FAMEHOUSE

Key guarantees across the whole process

7-Day Proposal

Proposal and preliminary quote within 7 business days of measuring, so you can decide quickly within budget.

Design & Production Aligned

Design, scheduling, production drawings and workshop data stay in sync, reducing on-site size and hole-position errors.

Own-Factory Delivery

No subcontracting — our own smart factory in Zhejiang produces directly, keeping delivery time and quality fully controlled.

Cross-Border Logistics & Install

Shenzhen–Hong Kong cross-border logistics plus on-site installation by our HK team, with one-stop handover and aftercare.

Moisture & Hardware Standards

Built for Hong Kong's humid climate: moisture-resistant edge banding, soft-close hinges and precision hardware throughout.

Global Brand-Grade QC

We apply the same quality-control system used for top global architectural brands, inspecting every unit before dispatch.

Ready to start your whole-home customisation?

Leave your contact details and we'll arrange for our Hong Kong team to discuss your floor plan, budget, measuring schedule and initial design direction within 1 business day.

Book a Free Measuring

Replies within 1 business day